rock bedding meaning in Chinese
岩石层理
Examples
- Analyzing on the elastic wave parameters characteristics of datong jurassic coal rock bed
大同侏罗纪煤田煤岩层弹性波参数特征浅析 - Ordovician carbonate rock bed of ordovician reservoir in qianmiqiao buried hill experienced two times of karst exposure and the post plaeogene deep - buried diagenesis
摘要千米桥潜山奥陶系储层经历了两次裸露岩溶及古近纪后的深埋藏成岩作用。 - General situation and characteristics of upper & lower lockheads design of zhuzhou navigation - power junction , and the contents and effect of simulation research on lockhead constructed on weak bed rock and ununiform rock bed are described
摘要介绍株洲航电枢纽船闸上下闸首的设计概况和特点、软弱岩石地基和不均匀岩石地基上闸首仿真研究的内容和效果。 - Finally , respect to the beam effect induced by special high ratio of modulus of elasticity of baise gravity dam , the sensitivity analysis are carried out to study the relation among displacement , stress state of dam and rock bed parameters
最后,针对百色重力坝特殊的高弹模比地质条件所致悬臂效应,对坝体及坝基的变形和应力状态与坝基力学参数之间的关系进行了参数敏感性分析。 - Step 6 : after complete the grouting and curing work between all the installation work in the liner ( including process piping , pipe support , etc . ) & liner and rock bed , complete the installation work of top elliptic head of liner using 35 / 50 ton hyd - crane and 25 ton truck crane
第六步:待衬管内所有的安装工作(包括工艺配管、管道支架等)及衬管与岩床间的灌浆、养护工作完成后,用35 / 50吨液压起重机和25吨汽车起重机完成衬管顶部封头的安装工作。